Completed Projects


Shikalbaha 225 MW Dual Fuel CCPP for UML (Union Mercantile Ltd) under L&T

Between April 2016 and February 2018 worked as Mechanical Sub-Contractor of UML (Union Mercantile Ltd) for following Mechanical works of L&T at Shikalbaha 225 MW Dual Fuel CCPP, Chittagong, Bangladesh.

B.O.P.:

  1. DM Plant - Civil Structure Erection.
  2. Chemical House - All Piping & Equipment (CPVC - piping, SS - piping, CS - piping).
  3. Deep Bore Well System - All C.S. Piping.
  4. HRSCC Round Tank - All GRP Pipelines.
  5. Sprinkler System for Diesel Engine Driven Firewater Pump & Diesel Tank.
  6. Clarified Water Pump House Civil Structure Erection.

Main Plant:

  1. Gas Booster & Air Compressor Building Civil Structure Erection.
  2. Circulating Water Pump House Structure Erection.
  3. G.T.G. Transformer - All Firefighting System Pipeline.
  4. S.T.G. Transformer - All Firefighting Pipeline.
  5. Gas Line Gas Booster to Gas Turbine Piping Work.
  6. Workshop Building Structure Erection & All Equipment.
  7. Workshop Building Overhead Crane Erection / Installing.
  8. Gas Booster Overhead Crane Erection / Installing.
  9. HRSG Piping Work.
  10. Air Instrument System - G.I. Pipeline Work.
  11. Service Water C.S. Piping.
  12. Effluent Transfer System CPVC Piping.

Third Triangle Area:

  1. Pontoon to HSD Tank Fuel Oil C.S. Pipeline.
  2. Firefighting + Foam Line Pump House to HSD Tank - All piping.
  3. Pump House Structure and All Equipment Installation.
  4. Service Water System C.S. Pipeline (B.O.P. to Pump House).

Figure: Mechanical works of L&T at Shikalbaha 225 MW Dual Fuel CCPP, Chittagong

Riser Clamps and Fender Supports of Offshore Jetty at Barabkunda for BM ENERGY BD Ltd. (Dutch-Bangladesh JV Company)

Fabrication of 5 pair Riser Clamps and 8 No. Fender Supports of BM ENERGY BD Ltd. (Dutch-Bangladesh JV Company) for their LPG receiving Offshore Jetty at Barabkunda, Chittagong, Bangladesh.

Figure: Fabrication works of Fender supports & Riser clamps ongoing for BM Energy

Fabrication & Erection works at BSRM Steel Melting & Billet Casting Plant

Fabrication & Erection works at BSRM Steel Melting & Billet Casting Plant, Sonapahar, Mirsarai and BSRM Iron & Steel Co (BISCO) ltd, Chittagong, till the end of 2015.

20 MT Electric Overhead Crane Assembly & Erection at Radiant Shipyard Ltd.

20 MT Electric Overhead Crane Assembly & Erection at Radiant Shipyard Ltd. Fabrication Yard- Daudpur, Rupganj.

Jamalpur 200 MW HFO Power Plant for United Mymensingh Power Co. Ltd.

Fabrication of Steel Structures at Ashulia Fabrication Yard and Erection of these Structures, Piping and Mechanical works of 200 MW HFO Power Plants at Jamalpur for United Power Generation Distribution Co. Ltd. Completion period - September 2018.

Figure: Fabrication of Steel Structures at Ashulia Fabrication Yard

115 MW HFO Power Plant at Jamalpur Site for United Jamalpur Power Co. Ltd.

Fabrication & Erection works of 115 MW Power Plant at Jamalpur Site.

Figure: Erection works of 200 MW Power Plant at Jamalpur Site

Bibiyana III Site 400 MW Combined Cycle Power Plant, Sylhet for L&T and Marubeni (Joint-Venture)

Piping Works at Bibiyana III Site 400 MW Combined Cycle Power Plant, Sylhet, Bangladesh under L&T Power, Vadodara, Gujarat, India (JV of L&T Power, India and Marubeni, Japan).

Figure: Critical Piping/Power Cycle Piping of 400MW CCPP Bibiyana-III Project

E.O.T. Crane (60 MT) Repair Works at Shikalbaha 225 MW CCPP, Chittagong

Repair, Assembly and Load Test of E.O.T. Crane (60 MT) at Shikalbaha 225 MW CCPP, Chittagong for L&T Power, India.

Figure: Assembly, Alignment and Load Test works in progress

300 MW (HFO based) Power Plant Project at Anowara, Chittagong

Fabrication of Steel Structures and Erection of these Structures, Piping and Mechanical works of 300 MW (HFO based) Power Plant Project at Anowara, Chittagong for United Power Generation Distribution Co. Ltd.

Figure: Fabrication of Steel Structures & Ducts at United Anowara Power Plant