115 MW HFO Power Plant at Jamalpur Site for United Jamalpur Power Co. Ltd.

Fabrication & Erection works of 115 MW Power Plant at Jamalpur Site.

Figure: Erection works of 200 MW Power Plant at Jamalpur Site

Bibiyana III Site 400 MW Combined Cycle Power Plant, Sylhet for L&T and Marubeni (Joint-Venture)

Piping Works at Bibiyana III Site 400 MW Combined Cycle Power Plant, Sylhet, Bangladesh under L&T Power, Vadodara, Gujarat, India (JV of L&T Power, India and Marubeni, Japan).

Figure: Critical Piping/Power Cycle Piping of 400MW CCPP Bibiyana-III Project

Bibiyana South Site 400 MW Combined Cycle Power Plant, Sylhet for L&T and Samsung (Joint-Venture)

Skilled Manpower Supply for Erection and assembly of Turbine works of Bibiyana South Project sites, Sylhet-Bangladesh.

Figure: Erection and assembly of Turbine works of Bibiyana South Project

300 MW (HFO based) Power Plant Project at Anowara, Chittagong

Fabrication of Steel Structures and Erection of these Structures, Piping and Mechanical works of 300 MW (HFO based) Power Plant Project at Anowara, Chittagong for United Power Generation Distribution Co. Ltd.

Figure: Fabrication of Steel Structures & Ducts at United Anowara Power Plant

E.O.T. Crane (60 MT) Repair Works at Shikalbaha 225 MW CCPP, Chittagong

Repair, Assembly and Load Test of E.O.T. Crane (60 MT) at Shikalbaha 225 MW CCPP, Chittagong for L&T Power, India.

Figure: Assembly, Alignment and Load Test works in progress